{"id":261,"date":"2019-09-10T15:25:23","date_gmt":"2019-09-10T13:25:23","guid":{"rendered":"https:\/\/awashbasinplatform.org\/?page_id=261"},"modified":"2020-08-24T08:28:06","modified_gmt":"2020-08-24T06:28:06","slug":"blue-deal-awash-program","status":"publish","type":"page","link":"https:\/\/awashbasinplatform.org\/en\/home\/projects\/blue-deal-awash-program\/","title":{"rendered":"Blue Deal Awash Partnership Program"},"content":{"rendered":"\n<p>In the Blue Deal Awash\nPartnership Program DWA works together with the Ethiopian government to improve\nwater management in the basin of the Awash river. This program includes three\nprojects:<\/p>\n\n\n\n<ol class=\"wp-block-list\"><li>Implementing a river basin management plan<\/li><li>Improving data and information management\nof the water system<\/li><li>Developing a system of licensing,\nmaintenance and charges for discharging water<\/li><\/ol>\n\n\n\n<h3 class=\"wp-block-heading\">Project 1<\/h3>\n\n\n\n<p><span style=\"text-decoration: underline;\"><strong>Implementing a river basin management plan<\/strong><\/span><\/p>\n\n\n\n<p>The Basin Development Authority (BDA) and the Awash BAsin Development Office ( AwBDO) in Ethiopia are responsible for the water management in the Awash river basin. In the past, DWA supported these institutes by writing a strategic river basin management plan and various action programs. Now, these have to be implemented. Many Ethiopian partners are involved. The implementation is a large and complex project which requires a lot of cooperation. To implement a plan on this scale is new for BDA and AwBDO. Within the Blue Deal DWA will support them on the following issues: how to organize the implementation of the plan? How to involve other government agencies and stakeholders? How to monitor progress and make adjustments? What competences do the experts need in order to reach a good implementation and how can they develop on this? <\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Project 2<\/h3>\n\n\n\n<p><span style=\"text-decoration: underline;\"><strong>Improving data and information management of the water system (basin information management<\/strong><\/span><strong>)<\/strong><\/p>\n\n\n\n<p>Data and information management presents many challenges. There is little good data. The available data are not kept in a central location, sometimes get lost and are not exchanged. In the Blue Deal DWA supports the local partners to get data management and data sharing in order, and to better meet the information needs of stakeholders.<\/p>\n\n\n\n<figure class=\"wp-block-gallery columns-2 is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\"><ul class=\"blocks-gallery-grid\"><li class=\"blocks-gallery-item\"><figure><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/awashbasinplatform.org\/wp-content\/uploads\/2019\/10\/WD_WP3-2-1-1024x683.jpg\" alt=\"\" data-id=\"673\" data-link=\"https:\/\/awashbasinplatform.org\/en\/projects\/blue-deal-awash-program\/wd_wp3-2-1-2\/\" class=\"wp-image-673\" srcset=\"https:\/\/awashbasinplatform.org\/wp-content\/uploads\/2019\/10\/WD_WP3-2-1-1024x683.jpg 1024w, https:\/\/awashbasinplatform.org\/wp-content\/uploads\/2019\/10\/WD_WP3-2-1-300x200.jpg 300w, https:\/\/awashbasinplatform.org\/wp-content\/uploads\/2019\/10\/WD_WP3-2-1-768x512.jpg 768w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/awashbasinplatform.org\/wp-content\/uploads\/2019\/10\/WD_WP3-5-1024x683.jpg\" alt=\"\" data-id=\"661\" data-link=\"https:\/\/awashbasinplatform.org\/en\/projects\/blue-deal-awash-program\/wd_wp3-5-2\/\" class=\"wp-image-661\" srcset=\"https:\/\/awashbasinplatform.org\/wp-content\/uploads\/2019\/10\/WD_WP3-5-1024x683.jpg 1024w, https:\/\/awashbasinplatform.org\/wp-content\/uploads\/2019\/10\/WD_WP3-5-300x200.jpg 300w, https:\/\/awashbasinplatform.org\/wp-content\/uploads\/2019\/10\/WD_WP3-5-768x512.jpg 768w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure><\/li><\/ul><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">Project 3<\/h3>\n\n\n\n<p><span style=\"text-decoration: underline;\"><strong>Developing a system of licensing, maintenance and charges for discharging water (Industrial Waste Water Discharge Regulation<\/strong><\/span><strong>)<\/strong><strong> <\/strong><\/p>\n\n\n\n<p>Industrial development, intensification of&nbsp; (farming) land use and the fast population growth result in heavy pollution of the surface water. Health of people and animals is endangered. There is no good regulation on these polluting activities. In the Blue Deal DWA is going to support the involved Ethiopian government agencies on how to set up licensing, inspection and maintenance. We also include the element of taxation on pollution.<\/p>\n\n\n\n<p>The Blue Deal Awash\nPartnership program is financed by the Ministry of Foreign Affairs and the\nMinistry of Infrastructure and Water. DWA is the implementing partner\nof the program.&nbsp; &nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>In the Blue Deal Awash Partnership Program DWA works together with the Ethiopian government to improve water management in the basin of the Awash river. This program includes three projects: Implementing a river basin management plan Improving data and information management of the water system Developing a system of licensing, maintenance and charges for discharging [&hellip;]<\/p>\n","protected":false},"author":6,"featured_media":655,"parent":75,"menu_order":2,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-261","page","type-page","status-publish","has-post-thumbnail","hentry","entry"],"acf":[],"_links":{"self":[{"href":"https:\/\/awashbasinplatform.org\/en\/wp-json\/wp\/v2\/pages\/261","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/awashbasinplatform.org\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/awashbasinplatform.org\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/awashbasinplatform.org\/en\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/awashbasinplatform.org\/en\/wp-json\/wp\/v2\/comments?post=261"}],"version-history":[{"count":4,"href":"https:\/\/awashbasinplatform.org\/en\/wp-json\/wp\/v2\/pages\/261\/revisions"}],"predecessor-version":[{"id":979,"href":"https:\/\/awashbasinplatform.org\/en\/wp-json\/wp\/v2\/pages\/261\/revisions\/979"}],"up":[{"embeddable":true,"href":"https:\/\/awashbasinplatform.org\/en\/wp-json\/wp\/v2\/pages\/75"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/awashbasinplatform.org\/en\/wp-json\/wp\/v2\/media\/655"}],"wp:attachment":[{"href":"https:\/\/awashbasinplatform.org\/en\/wp-json\/wp\/v2\/media?parent=261"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}